F or installers looking to deliver high-quality bathroom and wall finishes with less time on site, Multipanel offers a practical alternative to traditional tiling. Designed with efficiency in mind, these panels can be fitted quickly using basic tools most installers already have in their kit – no specialist equipment or lengthy prep work required. This also applies to Naturepanel, which is included in the imagery and can be installed using the same straightforward approach.
Unlike tiling, which involves multiple stages such as surface preparation, adhesive setting, grouting, and drying times, Multipanel streamlines the entire process. Large-format panels reduce the number of joins, while straightforward fixing methods mean you can achieve a clean, professional finish in a fraction of the time. The same time-saving benefits extend to Naturepanel installations, helping maintain consistency across different panel styles. This speeds up installation and minimises disruption. www.grantwestfield.co.uk
1 PREPARE THE ROOM AND MEASURE THE SPACE
Ensure all wall surfaces are clean, dry, and level before installation. Panels should be stored flat and acclimatised in the room prior to fitting. Measure the height and width of each wall to determine the number of panels required and plan the installation layout.
2 TOOLS REQUIRED FOR INSTALLATION
Ensure all necessary tools are available before starting. These should include a tape measure, level, saw, adhesive, sealant, and application tools.
3 MEASURING AND MARKING/CUTTING PANELS
Carefully measure and mark each panel to size, allowing for accurate cuts and a precise fit. Cut panels to size using appropriate tools, ensuring clean, accurate edges for a professional finish.
4 DRY FITTING
Position panels in place without adhesive to check sizing, alignment, and overall fit before fixing.
5 APPLYING ADHESIVE/FIXING PANELS
Apply adhesive to the wall using the recommended method, such as V-groove or dot and dab, depending on the surface and installation requirements. Secure panels firmly to the wall, applying even pressure to ensure full contact and adhesion.
6 CHECKING ALIGNMENT
Use a level to ensure panels are straight and surfaces remain flat throughout the installation.
7 SEAL WITH HYDROLOCK
Apply Hydrolock sealant to panel joints to create a secure, water-resistant connection.
8 JOINING PANELS AND FINISHING EDGES
Fit panels together tightly, remove any excess sealant, and install trims and profiles for a clean, polished finish.
9 SEALING WET AREAS/FINISH INSTALLATION
In wet areas, apply silicone sealant to all joints and edges to ensure a fully waterproof installation. The completed installation provides a seamless, durable, and high-quality wall finish.
10 MAINTENANCE GUIDANCE
The panels can be easily maintained with regular cleaning using non-abrasive products to preserve their appearance.